Client St George Homes
The appointment is a management contract as lead consultant of the professional team. I was involved from the beginning when ground clearance/demolition, gas extraction until to the completion stages E to stage L.
The site is 2.4ha on the south bank of the Thames. Designated Brownfield site located on land formerly occupied by a gas works and hence requiring large quantities of contaminated material to be removed. The scheme proposals meet the policies set down by the government in PPG1, in terms of sustainable mixed-use development as well more specific guidelines provided within the Thames Strategy.
Site specific planning brief for the development was building to a maximum of eight storeys and provide for residential development of 440 units and 1100 habitable rooms.
The site is to provide a mixture of recreation, commercial and residential features to make it as far as possible self-contained and yet accessible to the public with regard to river access.
The idea was to create a “street” running from Smugglers Way to the riverside walk and a public piazza with restaurants and shops at ground level
Some of the balconies on this job were very long cantilevered and during construction balconies started wobbling and It was a valuable experience to follow and learned how this problem is rectified in collaboration with structural engineers, site project manager and as the architects.